Curb Ramp Inspection Form Must be filled out for every ramp constructed in County right-of-way in Sacramento County. This from must be filled out and submitted within ten days of ramp construction to the SacDOT Program Access Coordinator. Curb Ramp Location: Project Name:__________________________ . N/E . N/W . S/E . S/W N/S STREET_______________________________ E/W STREET______________________________ Curb Ramps per County Standard Drawing 4-23 & 4-24: Check One: . Vertical Curb . Rolled curb . One Ramp . Two Ramps STANDARDS: - NO POLES OR PULLBOXES SHALL BE LOCATED IN RAMPS - ALL ELEMENTS, EXCEPT GUTTERS AND RETAINING CURBS, MUST BE CONSTRUCTED PLANAR IN NATURE, WITH WEAKENED PLANED JOINTS SCORED BETWEEN EACH ELEMENT. - PAN MUST BE WITHIN STRIPED CROSSWALKS A1:_______ B1: _______ C1: _______ D1: _______ A2:_______ B2: _______ C2: _______ D2: _______ A3:_______ B3: _______ C3: _______ D3: _______ RIGHT SIDE LENGTH: ________ FT. _________ IN. PAN WIDTH: ________ FT. _________ IN. LEFT SIDE LENGTH: ________ FT. _________ IN. IF TWO RAMPS ON CORNER (DATA FOR 2ND RAMP): E1:_______ F1: _______ G1: _______ H1: _______ E2:_______ F2: _______ G2: _______ H2: _______ E3:_______ F3: _______ G3: _______ H3: _______ RIGHT SIDE LENGTH: ________ FT. _________ IN. PAN WIDTH: ________ FT. _________ IN. LEFT SIDE LENGTH: ________ FT. _________ IN. DISTANCE BETW. RAMPS: ______ FT. _______ IN. STREET NAME: ________________________ Inspected/measured by (print):______________________ Date Field Measured:__________________ Directions: Three measurements for all data shall be taken at the ramps and pans, one measurement shall be taken at the centerline of the element and the other two shall be taken 18 inches on either side of the first measurement for the element. None of the three recorded measurements of any element may exceed the limits indicated above. See reverse side for Compliance with Standards. Page 1 Curb Ramp Inspection Form Compliance with Standards: Note: All curb ramps should comply with SacDOT’s current design and construction standards. Where it is infeasible to construct or reconstruct a curb ramp to current standards, the Designer or Inspector must complete the Findings for Non-compliance Element(s) section below and state what the non-compliant element(s) are and the reason for the non-compliance. A drawing or picture can be included in the box below. After completing this form submit it to the SacDOT Program Access Coordinator for acceptance and then signature by the Director of SacDOT. Findings for Non-Compliance Element(s): ___________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ Picture or Drawing, if needed ______________________ _______________________ _______________________ __________________________ Designer/Inspector Date Reviewed by Date Approved by SacDOT Approved by Chief, Disability Program Access Coord. Director Date Compliance, Sac. Co. Date ___________________ __________________ ___________________ ______________________ Designer/Inspector Signature Reviewed by Signature SacDOT Dir. Signature Chief Disability Comp. Signature Page 2