AC Overlay Pavement Project

Project Description

Rehabilitate major roads and residential streets. Project work includes overlaying the roadway with asphalt concrete or placing a slurry seal, repairing failed areas of the pavement (base repair), installing ADA curb ramps and other accessibility improvements, repairing damaged gutter or sidewalk, installing video signal detection, adjusting manholes, restriping the roadway, and other various items of work necessary to complete the project.

2024

The following roadways have been identified for pavement maintenance and rehabilitation work to be completed in 2024.  Additional locations may be identified because maintenance needs can develop within a short period of time due to an aging roadway system. These locations will be reported in the Completed Project Expenditure Report.

AC Overlay Project 2023 Phase D:

  • District 2: Vintage Park Dr from Calvine Rd to Brittany Park Dr
  • District 3: CM11A (Mission North Park area)
  • District 3: Howe Ave from 520 ft north of Edison Ave to Auburn Blvd
  • District 3: Watt Ave from Fair Oaks Blvd to Hurley Wy
  • District 4: Elkhorn Blvd from 6th St to Dry Creek Rd

Phase D 2023 Map

AC Overlay Project 2023 Phase F:
  • District 1: 26th Avenue from 44th Street to Ethel Way
  • District 1: 45th Street from Soledad Avenue to 26th Avenue
  • District 1: Enrico Boulevard from Fruitridge Road to 26th Avenue
  • District 1: Inyo Avenue from Siskiyou Avenue to Del Norte Boulevard
  • District 1: Soledad Avenue from Del Note Boulevard to Ethel Way
  • District 1: Siskiyou Avenue from Sierra Vista Avenue to 23rd Avenue
  • District 1 (Bid Additive): Sweetwater Way from Del Norte Boulevard to 44th Street
  • District 2: PW01B (Includes Sky Parkway & 6th Parkway)
  • District 2 (Bid Additive): Wesley Ave from Cuny Ave to 49th Ave
  • District 3: Tupelo Dr from Roseville Rd to Daly Ave
  • District 4: Watt Ave from Don Julio Blvd to Elkhorn Blvd
  • District 5: Alder Ave from South Watt Ave to Hedge Ave
  • District 5 (Bid Additive):Osage Ave from South Watt Ave to Hedge Ave
  • District 5: River Rd from Twin Cities Rd to 2,000 ft south
  • District 5: Tokay Ln from west end to east end
  • Misc. Electrical Work: Bradshaw Rd south of HWY 50
  • Misc. Electrical Work: Fair Oak Blvd east of Baytree Place
  • Misc. Electrical Work: Madison Ave east of Manzanita Ave​
Phase F Map

AC Overlay Project 2024 Phase A:

  • District 1: FR04B (Fruitridge area. Portions of 25th Ave, 26th Ave, and 28th Ave)
  • District 2: FR01A & FR01B (Fruitridge Area. South of Fruitridge Rd, East of HWY 99)
  • District 2: Vintage Park Dr from Brittany Park Dr to Elk Grove Florin Rd
  • District 5: Dillard Rd from Magos Rd to Green Rd
  • District 5: Grand Island Rd from Grand Island Mansion to 6,000 ft north
  • District 5: Isleton Rd from about 8,150 ft south of Ko-Ket Resort (Entrance Sign) to 4,700 ft south
  • District 5: River Rd from about 2.500 ft south of Twin Cities Rd to 2,000 ft south
  • District 5: Twin Cities Rd from Pellandini Rd to Christensen Rd
  • ​District 5 (Bid Additive): Grand Island Rd from HWY 160 to 4,500 ft south

Phase A Map

AC Overlay Project 2024 Phase B:

  • District 3: AR04A Partial (Keane Dr area)
  • District 3: CM11B (Marconi Ave at Root Ave area)
  • District 3: Coyle Ave from Manzanita Ave to Dewey Dr
  • District 3: FF03A (Mercy San Juan area, north of Coyle Ave)
  • District 5: RM03A Partial (Lindenwood Wy area)

Phase B Map

AC Overlay Project 2024 Phase C:

  • ​District 3: Watt Ave from Hurley Ave to Arden Wy
  • District 4: Elkhorn Blvd from Dry Creek Rd to 18th St
  • District 4: Madison Ave from Blue Oak Dr to Main Ave

Phase C Map

AC Overlay Project 2024 Phase D:

  • District 1: Airport Blvd from Bayou Wy to about 1,000 ft north of HWY 5 overpass
  • District 3: PH07B2 (area South of Andrea Blvd, South of Woodside Dr)
  • District 3: Sunrise Blvd from American River Bridge to Winding Wy
  • District 4: Watt Ave from Elkhorn Blvd to Antelope Rd

2025

Please note: The following roadways have been identified for pavement maintenance and rehabilitation work to be completed in 2025.  Additional locations may be identified because maintenance needs can develop within a short period of time due to an aging roadway system. These locations will be reported in the Completed Project Expenditure Report.

AC Overlay Project 2025 Phase A​

  • District 1/3/4: Watt Avenue from Roseville Road to James Way / Street (Map 1)
  • District 3: Airbase Drive from Watt Avenue to overpass (Map 1)

  • District 4: Roseville Road from Watt Avenue to Madison Avenue (Map 1)
  • District 3: PH07B1 (south of Andrea Boulevard, north of Wo​odside Drive) (Map 2)
  • District 3: Tarleton Drive area (Map 3)
  • District 2: FR10B Partial (south of Fruitridge Road, east of 41st Street) (Map 4)
  • District 3: Sunrise Boulevard from Winding Way to Sunset Boulevard (Map 5)
  • District 5: Grand Island Road from 6,000 ft north of the Grand Island Mansion to State Route 160 (Map 6)
  • District 5: River Road from 4,560 south of Twin Cities Road to 660 feet south of Locke Road (Map 7)
  • District 3: CM11C (Hazelwood Drive area) (Map 8)
  • District 3: Keane Drive from Kipling Drive to east end (Map 9)
  • District 3/4: Madison Avenue from Hazel Avenue to Blue Oak Drive (Map 10)
  • District 3/Citrus Heights: Madison Ave from San Juan Avenue to Fair Oaks Boulevard (Map 11)
  • District 5: RM03A1 (south of Alderson Way, west of Thornhill Drive) (Map 12)
  • District 5: Crosswalk at Arcohe Union Elementary School (Ivie Road) (no map)​

Phase A 2025 Map

AC Overlay Project 2025 Phase B​

  • District 4: Elkhorn Boulevard from 18th Street to 26th Street (Map 1)
  • District 4/Rancho Cordova: Grant Line Road from Jackson Road to Keiver Boulevard (Map 2)
  • District 5: Bradshaw Road from Folsom Boulevard to Hyannis Way (Map 3)
  • District 5: Isleton Road from 1,100' north of Andrus Island Road to 3,300' south of Andrus Island Road (Map 4)
  • District 5: Twin Cities Road from Cosumnes River (8,830 ft west of Pellandini Road) to Pellandini Road (Map 5)
  • District 3: FF01B (south of Leader Way, north of Palm Avenue, west of Garfield) (Map 6)
  • District 3: Fair Oaks Boulevard from Manzanita Avenue to Marshall Avenue (Map 7)
  • District 3: FO14C Partial (Hidden Valley Circle area) (Map 8)
  • District 3: FO08B Partial (Buchanan Drive area) (Map 9)
  • District 3: TC04A (south of Marconi Avenue, north of El Camino Avenue) (Map 10)​

​2026 Planning

Please note: Project locations have not been fully planned. Public input and comments are welcome.

AC Overlay Project 2026 Phase A​

  • Locations to be determined

AC Overlay Project 2026 Phase B​

  • Locations to be determined

AC Overlay Project 2026 Phase C

  • Locations to be determined