Project Description
This project will extend Skyking Road from Metro Air Parkway to Phelan Drive and will include curb and gutter, separated sidewalk, landscaping and irrigation, street lighting, storm drainage, and a 12" potable water system.
Tentative Schedule
- Preliminary Engineering: 2025
- Environmental Clearance: 2025
- Design: 2025
- Right-of-Way Acquisition: 2025
- Construction: 2026
Funding
- The estimated construction cost for the project is $2,100,000. The project is funded by developer fees.