Project Description
The proposed project is the next critical step of improvements proposed for the South Watt Ave. corridor between Florin Rd. and Jackson Rd. (State Route-16), increasing the capacity of the road way from a two-lane facility to a four-lane facility with bicycle, pedestrian, and transit accommodations. The ultimate configuration of the corridor will incorporate additional capacity improvements, widening the four-lane facility to a six-lane road way with similar multimodal accommodations.
The proposed 3-mile long project will:
- Add 2 through traffic lanes
- Add 6 miles of sidewalks and bike lanes
- Create turn outs for future transit stops
- Improve 5 signalized intersections
- Replace the Morrison Creek Bridge
Project Benefits
The purpose of the South Watt Ave. Improvement Project is to:
- Reduce congested Vehicle Miles Traveled (VMT) and reduce congestion
- Provide long term economic benefit
- Provide additional mode choices
- Improve safety for all road users
- Support planned infill
- Secure right of way for the long-term needs of regional traffic
- Protect water quality with modern storm water management practices
Project Report
South Watt Avenue Improvement Project Report
Environmental Documents
Project Schedule
Preliminary Design: 2018-2020
Final Design: 2021 - 2024
Right of Way Acquisition: 2021 - 2024
Construction: 2024-2026