Franklin Rd. and East ParkwayRe-Paving OperationsLane closedDistrict 2: Patrick KennedyLane closed Jun 02 2015 - Jun 05 2015 - Re-Paving Operations136/2/20156/5/2015Center Parkway.
  
Hazel Ave. and Greenback Ln.Paving OperationsLane closedDistrict 4: Roberta MacGlashanLane closed Jun 02 2015 - Jun 04 2015 - Paving Operations146/2/20156/4/2015Sunrise Blvd.
  
Garfield Ave. and Auburn Blvd.Sewer pipeline rehabilitationLane closedDistrict 3: Susan PetersLane closed Jun 02 2015 - Jun 02 2015 - Sewer pipeline rehabilitation156/2/20156/2/2015None
  
Garden Hwy. and Airport Blvd.Cross Culvert Pipe ReplacementLane closedDistrict 1: Phil SernaLane closed Jun 09 2015 - Jun 10 2015 - Cross Culvert Pipe Replacement176/9/20156/10/2015W. Elverta Rd. or Garden Hwy to Power Line Rd.
  
Marshall Ave. and Nicklaus PlaceRepair of sewer pipelineLane closedDistrict 3: Susan PetersLane closed Jun 15 2015 - Jun 16 2015 - Repair of sewer pipeline186/15/20156/16/2015Travel northbound on Marshall Ave. east on Lincoln, south on Hollister Ave.
  
Woods Rd. and Hobday Rd.Cross Culvert Pipe ReplacementClosedDistrict 5: Don NottoliClosed Jun 25 2015 - Jun 26 2015 - Cross Culvert Pipe Replacement196/25/20156/26/2015Colony Road
  
Overwood Ct. to Tonkin Dr.Road base grind and re-paving operations.Lane(s) closedDistrict 3: Susan PetersLane(s) closed Jun 23 2015 - Jun 26 2015 - Road base grind and re-paving operations.206/23/20156/26/2015Beachwood Dr. would minimize traffic delays.
  
French Rd. and Power Inn Rd.Road Improvement ConstructionLane(s) closedDistrict 1: Phil SernaLane(s) closed Jun 22 2015 - Aug 28 2015 - Road Improvement Construction216/22/20158/28/2015Gerber Rd. or Elder Creek Rd.
  
Between Power Line Road and Tarboro LaneResurfacing RoadwayClosedDistrict 1: Phil SernaClosed Jul 13 2015 - Jul 27 2015 - Resurfacing Roadway227/13/20157/27/2015Del Paso Blvd. to Power Line Rd.
  
Pringle Ave. and Orr Rd.Cross Culvert Pipe Replacement.ClosedDistrict 5: Don NottoliClosed Jul 14 2015 - Jul 14 2015 - Cross Culvert Pipe Replacement.237/14/20157/14/2015Christensen Rd. or McFarland St.
  
Intersection of El Camino Ave. and north to Hazelwood Ave. Storm Drain ConstructionLane closedDistrict 3: Susan PetersLane closed Jul 06 2015 - Sep 21 2015 - Storm Drain Construction247/6/20159/21/2015Mission Ave.
  
Madison Ave. and Myrtle Ave. Underground utility locating (potholing) for sewer construction.Lane closedDistrict 3: Susan PetersLane closed Jul 08 2015 - Jul 09 2015 - Underground utility locating (potholing) for sewer construction.257/8/20157/9/2015Auburn Blvd. 
  
Edison Ave. and Pope Ave.Sewer main line repairLane closedDistrict 3: Susan PetersLane closed Jul 16 2015 - Jul 18 2015 - Sewer main line repair267/16/20157/18/2015Howe Ave.
  
West of San Juan Ave.Sewer main line repairsLane closedDistrict 3: Susan PetersLane closed Jul 20 2015 - Jul 21 2015 - Sewer main line repairs277/20/20157/21/2015Winding Way
  
Winding Creek Rd.Removal of abandoned cross culvert pipeClosedDistrict 3: Susan PetersClosed Jul 17 2015 - Jul 18 2015 - Removal of abandoned cross culvert pipe287/17/20157/18/2015None
  
Bell Street and Wright StreetSewer main line repairs.Lane closedDistrict 3: Susan PetersLane closed Jul 21 2015 - Jul 22 2015 - Sewer main line repairs.297/21/20157/22/2015Marconi Ave.
  
El Camino AveSewer main line repairs.Lane(s) closedDistrict 3: Susan PetersLane(s) closed Jul 22 2015 - Jul 23 2015 - Sewer main line repairs.307/22/20157/23/2015Marconi Ave.
  
Ladino RoadReplace cross culvert pipe.Lane closedDistrict 3: Susan PetersLane closed Jul 21 2015 - Jul 22 2015 - Replace cross culvert pipe.317/21/20157/22/2015Residence on Random Lane east of the intersection can access homes from Short Hills Road - Cathay Way.
  
El Camino Ave. to Marconi Ave.Construction of Sidewalk, Curb and Gutter.Lane closedDistrict 3: Susan PetersLane closed Jul 06 2015 - Sep 28 2015 - Construction of Sidewalk, Curb and Gutter.327/6/20159/28/2015El Camino Ave.
  
Renke Road and Herald RoadReplace cross culvert pipe.ClosedDistrict 5: Don NottoliClosed Jul 23 2015 - Jul 24 2015 - Replace cross culvert pipe.337/23/20157/24/2015Quiggle Rd.
  
Estates Drive to Eastern Ave.Installation of new water mainLane(s) closedDistrict 3: Susan PetersLane(s) closed Jul 28 2015 - Sep 04 2015 - Installation of new water main347/28/20159/4/2015Arden Way east bound back to Fair Oaks Blvd.
  
Hedge Ave.Installing new driveway pipes and profiling 1000 feet of roadside ditchClosedDistrict 5: Don NottoliClosed Aug 03 2015 - Aug 07 2015 - Installing new driveway pipes and profiling 1000 feet of roadside ditch358/3/20158/7/2015Mayhew Rd.
  
Buena Vista Ave. and Kenneth Ave. Asphalt grinding and Re-pavingLane closedDistrict 3: Susan PetersLane closed Aug 10 2015 - Aug 15 2015 - Asphalt grinding and Re-paving368/10/20158/15/2015Greenback Ln.
  
Sunset Ave.Sanitary sewer main line repairLane closedDistrict 3: Susan PetersLane closed Aug 08 2015 - Aug 13 2015 - Sanitary sewer main line repair378/8/20158/13/2015Sunrise Blvd. northbound to Sunset Ave. eastbound
  
Bonnie Way and Wright StreetRoad Grind and RepairLane closedDistrict 3: Susan PetersLane closed Aug 18 2015 - Aug 21 2015 - Road Grind and Repair388/18/20158/21/2015Alta Arden Expressway or Hurley Way
  
Lake Natoma Dr. and American River Canyon Dr.PG&E installing 16" pipeline undergroundLane closedDistrict 4: Roberta MacGlashanLane closed Aug 16 2015 - Sep 12 2015 - PG&E installing 16" pipeline underground398/16/20159/12/2015North on Main St. to east on Oak Ave. to south on Folsom Auburn Rd.
  
Illinois Ave. and Beech Ave.Asphalt grinding and re-paving roadwayLane(s) closedDistrict 4: Roberta MacGlashanLane(s) closed Aug 25 2015 - Aug 29 2015 - Asphalt grinding and re-paving roadway408/25/20158/29/2015Central Ave. for traffic north of Greenback Ln., Madison Ave. for traffic south of Greenback Ln.
  
Nickels Way and Berrendo Dr.Installing cross culvert pipeClosedDistrict 3: Susan PetersClosed Aug 27 2015 - Aug 28 2015 - Installing cross culvert pipe418/27/20158/28/2015Berrendo Dr. or Nickels Way.
  
Fruitridge Rd. and 20th. Ave.Placing Type 2 Slurry SealClosedDistrict 1: Phil SernaClosed Sep 04 2015 - Sep 05 2015 - Placing Type 2 Slurry Seal429/4/20159/5/201544th. Street
  
Calvine Rd. and Daron Ln.Placing Type 2 Slurry SealClosedDistrict 2: Patrick KennedyClosed Sep 04 2015 - Sep 05 2015 - Placing Type 2 Slurry Seal439/4/20159/5/2015Residents north of the bridge deck shall exit onto Bradshaw Rd. Residents south of the bridge deck shall exit onto Calvine Rd.