Project Description
This project will reconstruct Meister Way to a two-lane arterial from Bear Paw Dr to Lone Tree Rd. Improvements include curb and gutter, curb ramps, sewer, water and storm drainage. This project also includes installation of traffic signals at Metro Air Parkway, Badiee Dr and Lone Tree Rd.
Tentative Schedule
- Preliminary Engineering: 2023
- Environmental Clearance: Summer 2024
- Design: 2023 to 2024
- Right-of-Way Acquisition: 2024
- Construction: 2025 to 2026
Funding
The estimated construction cost for the project is $9,100,000. The project is funded through Metro Air Park Bonds.
Contract Information
Jenny Singh, Senior Civil Engineer
Phone: 916-874-6092
Email: singhje@saccounty.gov
Gabriel Flores, Associate Civil Engineer
Phone: 916-875-1612
Email: floresga@saccounty.gov