This project will widen Power Line Road and West Elverta Road from a two-lane local road to a two-lane arterial with a center turn lane. Widening will occur from Allbaugh Drive to West Elverta Rd and 2100’ east of the intersection along West Elverta Road. The roadway improvements will include curb and gutter, drainage facilities, and pavement overlay.


Project Schedule

  • Preliminary Engineering: 2022
  • Environmental Clearance: 2023
  • Design: 2023 to 2025
  • Right-of-Way Acquisition: 2025
  • Construction: 2026


Funding

Estimated total project costs are $5,574,000 and will be provided by Metro Air Park Impact Fee Program.